Before
After
Exterior trim boards needing some attention
New trim installed
Fresh paint
Large stucco repair
Structural framing taking place in this home has left a few walls opened up.
Dry wall replaced
Joints and screw holes have been patched in preparation for the entire house to be skim coated.
New HVAC system installed in this home has left a few walls opened up for the new lines.
Holes have been patched and skim coating the entire house will be the next step.
More structural work left a ceiling opened up.
A few supports added to hang the sheet rock were installed.
The new sheet rock was patched in.
Joint compound has applied and seams have taped. This house will be skim coated once all the repairs have been done.
Patching holes
Before baseboard missing
Baseboard installed
Walls and trim painted along with newly installed baseboard
Rotten trim and leaking gutters
Repaired rotten wood and installed new gutter section
Finished product freshly painted
Another rotten corner needing some attention.
New trim installed.
New corner installed on the gutters.