PSB Painting
Home
Laundry Room Reno Patio Railing & Retaining Wall Fireplace Tile Job Sunroom Remodel Repairs Flooring Fresh paint Before & After Tiling Bathroom renovation Repairing bathroom tile job Contact us
Home
PSB Painting
Residential Interior & Exterior Painting
Laundry Room RenoPatio Railing & Retaining Wall Fireplace Tile JobSunroom RemodelRepairsFlooring Fresh paintBefore & AfterTilingBathroom renovationRepairing bathroom tile jobContact us

Click photos for descriptions

 The plan for this job is to remove all the cedar trim, patch all the holes, remove dog door, remake new window sills to match the rest of the house and then paint it from top to bottom.
 The plan for this job is to remove all the cedar trim, patch all the holes, remove dog door, remake new window sills to match the rest of the house and then paint it from top to bottom.

The plan for this job is to remove all the cedar trim, patch all the holes, remove dog door, remake new window sills to match the rest of the house and then paint it from top to bottom.

 Another angle before any work begins.

Another angle before any work begins.

 This is a close up of the windows sill and trim that i’ll be removing and replacing.

This is a close up of the windows sill and trim that i’ll be removing and replacing.

 Dog door removed.

Dog door removed.

 Dog door patched and textured.

Dog door patched and textured.

 Test fit of the new window sills.

Test fit of the new window sills.

 Close up of the new window sills i built.

Close up of the new window sills i built.

 Another picture of the new window sills.

Another picture of the new window sills.

 More patching, texturing and window completed.

More patching, texturing and window completed.

 There were many holes to be filled and textured after removing the old trim and crown molding.

There were many holes to be filled and textured after removing the old trim and crown molding.

 The patching and texturing continues.

The patching and texturing continues.

 Finally painted, this is a shot of the newly made windows.

Finally painted, this is a shot of the newly made windows.

 The room is finished complete with a new ceiling fan installed.

The room is finished complete with a new ceiling fan installed.

 Last shot of the completed sunroom.

Last shot of the completed sunroom.

1 2 3 4 5 6 7 8 9 10 11 12 13 14
Previous Next
 The plan for this job is to remove all the cedar trim, patch all the holes, remove dog door, remake new window sills to match the rest of the house and then paint it from top to bottom.
 Another angle before any work begins.
 This is a close up of the windows sill and trim that i’ll be removing and replacing.
 Dog door removed.
 Dog door patched and textured.
 Test fit of the new window sills.
 Close up of the new window sills i built.
 Another picture of the new window sills.
 More patching, texturing and window completed.
 There were many holes to be filled and textured after removing the old trim and crown molding.
 The patching and texturing continues.
 Finally painted, this is a shot of the newly made windows.
 The room is finished complete with a new ceiling fan installed.
 Last shot of the completed sunroom.
 
Broomfield CO ,
United States
6039332127 Petersbarrego@gmail.com
Hours
Mon 8am-5pm
Tue 8am-5pm
Wed 8am-5pm
Thu 8am-5pm
Fri 8am-5pm